Solar Inc Ltd has been facilitating Solar PV and Battery Storage projects for a number of years now . We have been involved is at least 27 large scale PV projects were we have introduced landowners to the developers and renewables investors .
We understand that developing solar projects is becoming more complex and challenging due to the lack of capacity on electricity distribution networks, ever changing government support mechanism, new constrains on the planning process . So teaming up with the right partner with the right leads is now more important than ever before. For "Shovel Ready" Developments - costs have increased from £50000 per MW to as much as £180000 per MW . Connection costs have rocketed to exceed £100000 per MW in the recent months.
We offer a refreshing alternative --- to develop your site yourself. You can be confident that we possess the experience, knowledge that makes us the right choice to assist in making your project a success.
We do the legwork of finding potentially suitable site for your project .
We introduce the renewable concept to the landowner and secure grid connection .
If you have your own in house planning team you can take the project over at this stage . If you want us to assist you with planning , we have a wide range of industry consultants that are able to assist you .Which level of support you require we are able to offer you flexibility. Our introductions start from only £5000 per MW. This significantly reduces your financial exposure due to failed planning.
It takes average of 120 leads to find a suitable site with capacity available and willing landowner. It costs tens of thousands of pounds to generate these leads . It takes months to negotiate and receive grid offers
All of this will cost you only £25000 per site if you buy it from us. It makes sense to do away with the tedious legwork of searching yourself.
We have the knowhow and IT tools to conduct the search efficiently and effectively. Why duplicate the work?
PV projects Land General Criterion
a.The land is Grade 2,3 or 4,
b. The land is available within 4 months.
c. The site is visually well shielded.
d. No AONB, No SSSI designation
e. 14 to 170 acres in sizef. secured export grid capacity
g. willing landowner (based on standard industry rents of £1000 per acre).
Please call for the details.